Warehouse
12119 min to haunch
A-A Warehouse Section
4 5 6 7 8 9 10 11 B1 B A
Non-load bearing 1 hour fire resistant Non-load bearing 1 hour fire resistant
compartment roof formed over office. compartment roof formed over office.
Refer to Engineers drawings for full Refer to Engineers drawings for full
structural details, the partition setting out structural details, the partition setting out
drawing for details of build up and drawing for details of build up and
insulation, and fire strategy drawing for
insulation, and fire strategy drawing for
1 hour fire stair enclosure details of the fire protection. details of the fire protection.
Office, core facilities and stairwells to be Warning signage to be fitted to the facia Warning signage to be fitted to the facia
heated spaces. Warehouse to be an on the warehouse side in at least 3 on the warehouse side in at least 3
unheated space locations stating 'WARNING, NON-LOAD 1 hour locations stating 'WARNING, NON-LOAD
BEARING ROOF. DO NOT USE FOR fire stair BEARING ROOF. DO NOT USE FOR
enclosure
STORAGE' STORAGE'
Fire Escape
Washrooms Stair
Office 3580 FFFL-TOS 2700 FFL-FCL Office 2700 FFL-FCL 1367
FFFL 824
1 hour fire resistant compartment floor 1 hour fire resistant compartment floor
formed over warehouse void. Refer to
WC's Double formed over warehouse void. Refer to Warehouse 3900 FGFL-FFFL 3678 FGFL-SFFL details, the RA floor drawing for details Warehouse 3900 FGFL-FFFL 3678 FGFL-SFFL 1367
Engineers drawings for full structural
Engineers drawings for full structural
Height Lobby
details, the RA floor drawing for details
of build up and insulation, and fire of build up and insulation, and fire
FGFL strategy drawing for details of the fire strategy drawing for details of the fire 824
protection.
protection.
B-B Office Sectio C-C Office Section
A725