REFURBISHMENT WORKS
A development by;
EXTERNAL
External fabric ( inc goods yard)
· All roof and gutters fully cleaned. · Re-line existing road markings/walkways on
concrete yard slab.
· Cladding to the external elevation fully washed
down and cleaned. · Replace bollards at load bay doors.
Established in the north east of Scotland in 1987, Knight Property
DRAFT
Group is an award winning developer, renowned for the development · Existing rainwater downpipes, eaves and gutter · Install new impact protection around brick piers
and delivery of speculative and pre-let commercial properties across flashings to be re-painted. at load bay doors.
the logistics, office, industrial and trade counter sectors. Active
throughout Glasgow, Edinburgh, the central belt and Aberdeen, Knight · External fire exit doors to be repainted. · Replace 2 vehicle access door and service TANNOCHSIDE DRIVE | TANNOCHSIDE PARK | UDDINGSTON | G71 5PD
the remaining door to current operational
Property Group has developed market leading sites including Belgrave · Existing cladding around office block to be
Logistics Park, 4/5 Lochside Avenue, Langlands Commercial Park, The cleaned and repainted. standards.
Capitol, 4North, Kingshill Commercial Park and The Hub Aberdeen. · Clean down and remove weeds from all paths
· Existing window frames around office block
around the building.
The asset was built by way of a Design and Build style contract. (externally only) to be re-painted.
Warranties will be available from the design team and main contractor.
INTERNAL
Office Block Warehouse Offices
· Steam clean all carpets throughout. · Re-decorate walls, doors, skirtings, and facings.
· Re-decorate all walls, ceilings, doors, skirtings · Replace kitchen and tea preparation.
and facings.
· Replace vinyl flooring covering.
· Steam clean remaining carpets to welfare area.
UNIT 7, KINGSHILL COMMERCIAL PARK, WESTHILL Warehouse
· Remove damaged fire line board to all columns Mechanical and Electrical
and re paint with intumescent paint.
· Full test and certify existing electrical
· Re-decorate all internal steelwork.
installation throughout.
· Over sheet existing wall cladding with single
· Carryout an emergency lighting test and
sheet cladding .
provide certification.
· Strip out and remove redundant gas pipe
· Carryout Legionella test and certify.
· Re-line/paint existing walkways.
· Replace modular light fittings with LED modular
lights within welfare facility.
· Remove and replace radiator with electric panel
PHASE 4 LANGLANDS COMMERCIAL PARK 3 BELGRAVE STREET, BELLSHILL heaters in warehouse office.